OdysseyConstruction Company (269) 447-1401
The work

The part you never see.

A basement floor doesn’t pour itself. Jake and the crew, mid-pour.

Scroll
One basement · poured to finished

Watch it wet to cured.

The mix comes down the chute into a basement that never had a proper floor.
Jake and the crew rake it level, corner to corner, while it is still workable.
Floated smooth. The finish happens in the minutes before it sets, not after.
The same basement, cured. Stone walls, new slab, ready for whatever comes next.
The pour
On the jobs

More of the real thing.

Nothing staged, nothing stock.

Floating concrete, in the crawlspace
Siding, colour transformation
Egress window, dug and set
Brick patio, restored
Stills from the jobs

Shot on site.

Finished kitchen with oak cabinetry, white herringbone backsplash, stainless range and French-door refrigerator
Warm oak kitchen
Finished bathroom with a long white double vanity, twin mirrors and a tiled shower beyond
Double-vanity bath
Finished sunroom with white walls, wraparound windows and hardwood flooring
Light-filled sunroom
Wide finished kitchen with white cabinetry, stainless appliances and natural wood flooring
Open-plan kitchen
Finished white-tile bath surround with two illuminated inset niches and a slim mosaic accent
Tile and niches
Finished kitchen with white cabinetry, blue-gray walls and stainless appliances
Blue-gray kitchen
Ready when you are

Tell us about your project.

Text (269) 447-1401

Kalamazoo, Michigan and surrounding areas.